Industrial Manufacturer Consolidates Servers Into Mega Data Centers To Reduce Cost

This case study describes how a major manufacturer used Bright Cluster Manager to dramatically reduce the number of required servers and to maximize utilization of the consolidated infrastructure.

Download Now  

Subscribe to Email Updates